Blower Door Testing in Framingham, MA — Specialized Energy Code Town
RESNET and BPI-certified blower door air leakage testing for new construction, Mass Save programs, and MA Stretch Code compliance in Framingham, MA.
2026 Massachusetts Energy Code Facts — Framingham
Framingham enforces the Municipal Opt-in Specialized Energy Code (225 CMR 23), effective 7/1/2026 — one of only 60 Massachusetts municipalities to adopt it (a Stretch Code community since 1/1/2014). For 2026 permits, new homes must reach a maximum HERS Index of 42 (mixed-fuel) or 45 (all-electric) — up to 48 with qualifying credits — verified by a RESNET-certified HERS rater. ADUs must meet HERS 52–58, and major alterations, additions or change-of-use projects HERS 65–75, depending on fuel type and on-site solar.
- Energy code status: Specialized Opt-in Code (adopted 7/1/2026) — 1 of 60 MA municipalities (as of the June 2026 Mass.gov adoption list).
- Specialized Code requirements in Framingham: new multifamily buildings over 12,000 sq ft must be Passive House certified; all-electric homes must use heat pumps for heating and hot water; homes that keep fossil fuels need electrification pre-wiring and rooftop solar, and fossil-fuel homes over 4,000 sq ft must certify net-zero (HERS 0).
- Required testing & verification: blower door (air infiltration) testing, duct leakage testing, balanced mechanical ventilation (ERV/HRV), plus EV-ready and solar-ready provisions on the HERS compliance path. New homes in Massachusetts (Climate Zone 5) must test at or below 3.0 ACH50 on the blower door test.
- Mass Save® 2026 new-construction incentives: up to $25,000 per all-electric single-family home (Passive House tier; $7,500 base tier, $15,000 ENERGY STAR® NextGen tier — HERS ≤45), up to $40,000 for a 4-unit building, up to $3,750/unit for 5+ unit multifamily, and up to $30,000 for major all-electric renovations. Every tier requires enrollment and verification by an approved HERS rating company.
Related Framingham services: HERS Rating Framingham · Duct Leakage Testing Framingham · Stretch Code Compliance Framingham · MA Energy Codes Guide — or get a free quote from our RESNET-certified team (617-584-1809).
Sources: 2025 DOER Massachusetts Stretch & Specialized Codes Technical Guidance (Sept 2025); Mass.gov Building Energy Code Adoption by Municipality (June 2026); Mass Save 2026 Residential New Construction program.

Common Questions About the Framingham Energy Code
Does Framingham require a HERS rating in 2026?
Yes. Framingham follows the Municipal Opt-in Specialized Energy Code (effective 7/1/2026) on top of the Stretch Code it adopted in 1/1/2014. New dwellings need a certified HERS rating from a RESNET-accredited rater before the certificate of occupancy.
What is the maximum HERS score allowed in Framingham?
New homes in Framingham must score HERS 42 or lower (mixed-fuel) or HERS 45 or lower (all-electric) — up to 48 with qualifying credits. Fossil-fuel homes over 4,000 sq ft must certify net-zero (HERS 0), and multifamily over 12,000 sq ft needs Passive House certification.
What building energy code is Framingham on right now?
Framingham is one of only 60 of Massachusetts’ 351 municipalities on the Specialized Opt-in Code (225 CMR 23) per the June 2026 Mass.gov adoption list — the state’s most stringent energy code tier.
Official Maximum HERS Index Scores (Table R406.5)
These are the official maximum HERS Index scores that apply to projects in Framingham under Table R406.5 of the current code (2025 DOER Technical Guidance):
| Building type | New construction (permits after 7/1/2024) | New construction w/ embodied-carbon credit (R406.5.2) | Accessory Dwelling Units | Major alterations, additions, change of use |
|---|---|---|---|---|
| Mixed-fuel building | 42 | 45 | 52 | 65 |
| Mixed-fuel + solar electric | 42 | 45 | 55 | 70 |
| All-electric building | 45 | 48 | 55 | 70 |
| All-electric + solar electric | 45 | 48 | 58 | 75 |
Scores are measured before counting on-site renewable generation (per R406.5). Historic buildings may opt out for alterations under R503.1.1. Embodied-carbon credits (+3 points) come from low-GWP concrete and insulation EPDs per Table R406.5.3/R406.5.4.
Complete Stretch Code Compliance Requirements in Framingham
Beyond the HERS maximums above, every new dwelling in Framingham on the HERS pathway must satisfy four code sections — R403.6 (Ventilation), R404.4 (EV Ready), R406 (HERS) and Appendix RB (Solar Ready) — per the 2025 DOER Technical Guidance:
- Balanced mechanical ventilation (R403.6): an ERV or HRV system meeting minimum system airflow, heat/energy-recovery efficiency, fan sound ratings and regulated air-inlet and exhaust locations — verified by field testing.
- EV-Ready parking (R404.4): pre-wiring with a connection point and dedicated electrical panel capacity for future vehicle charging.
- Solar-Ready roof (Appendix RB): a dedicated solar zone with structural-load verification, an electrical interconnection pathway and reserved panel space — unless the project installs solar directly.
- Air-tightness & duct sealing: blower door result of 3.0 ACH50 or lower (Climate Zone 5) and duct leakage within 4 CFM25 per 100 sq ft.
Passive House alternative (R405): Phius or PHI certification satisfies the code in Framingham in place of a HERS score — with a Certified Passive House Consultant for design and a Phius Certified Verifier/Rater during construction — and still requires EV-Ready and Solar-Ready compliance. Prescriptive path: allowed only for buildings without individually separate dwelling units, additions, and alterations — and a whole-building prescriptive project must implement 2 of the 3 additional-efficiency packages in R408 (enhanced envelope, higher-efficiency HVAC, or reduced water-heating energy). Additions of 1,000 sq ft or more (or exceeding 100% of the existing floor area) must meet both R502.3 prescriptive and the R406.5 HERS limits. Level III alterations (work area over 50% of the home and over 1,000 sq ft) also trigger HERS compliance; historic buildings are exempt under R501.6. Note that ENERGY STAR® is no longer a compliance path — HERS and Passive House are the two certification routes in Framingham.
Framingham’s Specialized Code: Three Ways to Comply (Appendix RC)
- Zero Energy Pathway (RC102): certify HERS 0 or lower — the home produces as much energy as it uses. Before counting on-site solar, the design must still score ≤45 (all-electric) or ≤42 (mixed-fuel) and meet IECC 2021 envelope U-factors. Alternative: Passive House plus a Phius ZERO design certification — the only Specialized option that can credit off-site renewable energy.
- All-Electric Pathway (RC103) — the most common route in Framingham: comply with the R408.2 HVAC and water-heating efficiency packages (electric-resistance primary heating is excluded — heat pumps required), meet EV-Ready and Solar-Ready, then either achieve a final certified HERS of 45 or less without on-site power (with ERV/HRV, R406.2 lighting, and base-code U-factors) or pre-certify to Phius CORE / PHI. With load-management design, most all-electric homes run on a standard 200-amp panel.
- Mixed-Fuel Pathway (RC104) — only for dwellings under 4,000 sq ft: score HERS 42 or less without on-site power, plus electric-readiness (RC104.3), on-site renewables (RC104.4/RC105) and EV-Ready — or pre-certify Passive House with electric readiness. Electric readiness in Framingham means a 250-volt/40-amp outlet within 3 feet of any gas or propane range, a 250-volt/30-amp outlet within 3 feet of the clothes dryer, a reserved branch circuit for a future heat-pump heating system, and a heat-pump water-heater location with 7-foot clearance.
Detail sourced from the 2025 Massachusetts Stretch & Specialized Codes Technical Guidance (DOER, Sept 2025), Table R406.5 and Appendix RC.
Professional Blower Door Testing Services in Framingham, Massachusetts
RESNET and BPI-certified blower door air leakage testing for new construction, Mass Save programs, and MA Stretch Code compliance in Framingham, MA. We measure air infiltration in CFM50 and ACH50 — the standard metrics required for Stretch Code compliance.
New construction in Framingham must achieve 3.0 ACH50 or less under the MA Stretch Code. Our certified test results are accepted by all Massachusetts building departments, utilities, and Mass Save program administrators.
Our Blower Door Testing Process in Framingham
- Free Quote: Contact us for a transparent quote for blower door testing in Framingham. Package pricing with HERS Rating available.
- Schedule Test: We schedule at a time convenient for your construction timeline — including intermediate tests during framing.
- On-Site Testing: Our certified technician installs the blower door fan and records CFM50 and ACH50 measurements.
- Report Delivery: Certified blower door report delivered within 24 hours — ready for permits, Mass Save, and HERS Rating.
Related Services in Framingham
HERS Rating in Framingham
Blower door testing is included in every HERS Rating.
Learn More →
Duct Leakage Testing in Framingham
Often scheduled together to minimize mobilization costs.
Learn More →
MA Stretch Code in Framingham
Full IECC 2021 compliance — blower door is required at 3.0 ACH50.
Learn More →
Frequently Asked Questions — Blower Door Testing in Framingham
How much does blower door testing cost in Framingham, MA?
Blower door testing pricing in Framingham: Single-family homes $1,850–$2,500 (when combined with HERS Rating) · Standalone blower door tests start from $1,850. Contact us for a free quote — package pricing available when combined with duct leakage testing and HERS Rating.
What is the blower door requirement in Framingham?
New residential construction in Framingham under the MA Stretch Code must achieve 3.0 ACH50 or less. The IECC 2021 base code requires 5.0 ACH50 or less.
How long does a blower door test take in Framingham?
The on-site blower door test in Framingham takes 1–2 hours. We deliver your certified test report within 24 hours.
Is blower door testing required for Mass Save rebates?
Yes. Blower door testing is required for Mass Save air sealing and insulation rebates in Framingham. Our certified results are accepted by all Mass Save program administrators.
More Cities Near Framingham
Schedule Blower Door Testing in Framingham
Contact HERS Rating Company for a free quote on blower door testing in Framingham, MA. RESNET and BPI-certified, 24-hour turnaround.
Also Serving Nearby Cities
We provide Blower Door Testing services throughout the region. Nearby cities we serve: Ashland · Natick · Holliston · Southborough · Hopkinton