MA Stretch Code Compliance in Charlemont, MA
Complete MA Stretch Code 2021 (IECC 2021) compliance services for new residential construction in Charlemont, MA — from plan review through HERS certification.
MA Stretch Code 2021 Compliance Services in Charlemont, Massachusetts
Complete MA Stretch Code 2021 compliance services for new construction in Charlemont, MA. We manage the entire process — plan review, energy modeling, blower door testing, duct leakage testing, and final HERS certification — so your project meets all requirements.
Charlemont has adopted the MA Stretch Code, requiring new residential buildings to achieve: HERS score 55 or below · blower door 3.0 ACH50 or less · total duct leakage 4% or less. All requirements must be verified by a RESNET-certified rater.
Our MA Stretch Code Compliance Process in Charlemont
- Plan Review & Quote: Submit your building plans. We review them, model them to a HERS score, and provide a compliance roadmap and quote.
- Pre-Construction Modeling: We model your plans to a HERS score before construction begins — identifying compliance risks cost-effectively.
- Construction Phase Testing: Intermediate blower door and duct tests verify compliance during construction.
- Final Certification: Final HERS Rating, RESNET-certified compliance report, and documentation for your building department.
Related Services in Charlemont
HERS Rating in Charlemont
HERS score 55 or below required for MA Stretch Code.
Learn More →Blower Door Testing in Charlemont
3.0 ACH50 or less required under MA Stretch Code.
Learn More →Duct Leakage Testing in Charlemont
4% or less total duct leakage required for forced-air systems.
Learn More →Frequently Asked Questions — MA Stretch Code Compliance in Charlemont
How much does MA Stretch Code compliance cost in Charlemont?
MA Stretch Code compliance package pricing in Charlemont: Single-family homes $1,850–$2,500 · Multifamily (per unit) $650–$1,200 · ADUs $1,600–$1,850. Full package includes HERS Rating, blower door testing, and duct leakage testing. Contact us for a free, project-specific quote.
Does Charlemont require the MA Stretch Code?
Yes. Charlemont has adopted the MA Stretch Code, requiring new residential construction to achieve: HERS score 55 or below · blower door 3.0 ACH50 or less · total duct leakage 4% or less — all verified by a RESNET-certified rater.
How do I prove MA Stretch Code compliance in Charlemont?
Compliance is documented through a RESNET-certified HERS Rating report. Our reports are accepted by the Charlemont building department and all Massachusetts municipalities as proof of MA Stretch Code compliance.
What is included in the full MA Stretch Code compliance package?
Our full compliance package for Charlemont includes: energy modeling from building plans · blower door air leakage test · duct leakage test · final HERS Rating · RESNET-certified compliance report for the building department.
More Cities Near Charlemont
Get MA Stretch Code Compliance in Charlemont
Contact HERS Rating Company for a free quote on MA Stretch Code 2021 compliance in Charlemont, MA. Full package: HERS Rating, blower door, and duct leakage testing.