MA Stretch Code Compliance in Holden, MA

Complete MA Stretch Code 2021 (IECC 2021) compliance services for new residential construction in Holden, MA — from plan review through HERS certification.

RESNET Certified
Mass Save Qualified
IECC 2021 Experts
Full Compliance Package
Serving Holden, MA

2026 Massachusetts Energy Code Facts — Holden

Holden is one of only 49 Massachusetts municipalities still on the Base Energy Code (10th Edition — IECC 2021 with MA amendments) as of the June 2026 Mass.gov adoption list — the Stretch Code does not apply here. HERS ratings remain an approved compliance path under the Base Code, and a RESNET-certified HERS rater is required to qualify for Mass Save® new-construction incentives.

  • Energy code status: Base Code (10th Edition, IECC 2021 w/ MA amendments) — 1 of 49 MA municipalities (as of the June 2026 Mass.gov adoption list).
  • Required testing & verification: blower door (air infiltration) testing, duct leakage testing, balanced mechanical ventilation (ERV/HRV), plus EV-ready and solar-ready provisions on the HERS compliance path.
  • Mass Save® 2026 new-construction incentives: up to $25,000 per all-electric single-family home (Passive House tier; $7,500 base tier, $15,000 ENERGY STAR® NextGen tier — HERS ≤45), up to $40,000 for a 4-unit building, up to $3,750/unit for 5+ unit multifamily, and up to $30,000 for major all-electric renovations. Every tier requires enrollment and verification by an approved HERS rating company.

Related Holden services: HERS Rating Holden · Blower Door Testing Holden · Duct Leakage Testing Holden · MA Energy Codes Guide — or get a free quote from our RESNET-certified team (617-584-1809).

Sources: 2025 DOER Massachusetts Stretch & Specialized Codes Technical Guidance (Sept 2025); Mass.gov Building Energy Code Adoption by Municipality (June 2026); Mass Save 2026 Residential New Construction program.

HERS Rating Holden MA — Stretch Code compliance testing for an energy efficient home in Holden, Massachusetts
On-site Stretch Code compliance testing by our RESNET-certified team serving Holden, Massachusetts.

Common Questions About the Holden Energy Code

Do I need a HERS rating for a new home in Holden?

Not by local code — Holden is one of just 49 Massachusetts municipalities still on the Base Energy Code (10th Edition, IECC 2021 with MA amendments), so the Stretch Code HERS mandate does not apply. A HERS rating is still an accepted compliance path and is required for Mass Save® new-construction incentives.

What HERS score is required in Holden?

There is no mandatory HERS maximum under the Base Code in Holden, but the ERI compliance path follows IECC 2021 limits, and Mass Save incentive tiers require HERS 45 or better for the ENERGY STAR® tier.

Which energy code does Holden follow in 2026?

Holden follows the Massachusetts Base Energy Code (10th Edition, IECC 2021 with amendments) as of the June 2026 Mass.gov adoption list — one of only 49 communities statewide that have not adopted the Stretch Code.

Official Maximum HERS Index Scores (Table R406.5)

For comparison, here is the official maximum-HERS table that applies in Massachusetts Stretch Code and Specialized Code communities (Table R406.5, 2025 DOER Technical Guidance):

Building typeNew construction (permits after 7/1/2024)New construction w/ embodied-carbon credit (R406.5.2)Accessory Dwelling UnitsMajor alterations, additions, change of use
Mixed-fuel building42455265
Mixed-fuel + solar electric42455570
All-electric building45485570
All-electric + solar electric45485875

Scores are measured before counting on-site renewable generation (per R406.5). Historic buildings may opt out for alterations under R503.1.1. Embodied-carbon credits (+3 points) come from low-GWP concrete and insulation EPDs per Table R406.5.3/R406.5.4.

What Base Code Status Means for Holden Projects

As one of only 49 Base Code communities, Holden projects follow the 10th Edition code (IECC 2021 with MA amendments) via the prescriptive path, the simulated-performance path, or the Energy Rating Index (HERS) path — without the Stretch Code’s lowered HERS caps shown above. Builders in Holden still order HERS ratings for the ERI compliance path, for Mass Save® incentives (which always require HERS verification), and to document energy performance for buyers. If Holden adopts the Stretch Code at a future town meeting, the table above becomes mandatory — surrounding towns already enforce it, so Holden builders often test to those standards today.

Detail sourced from the 2025 Massachusetts Stretch & Specialized Codes Technical Guidance (DOER, Sept 2025), Table R406.5 and Appendix RC.

MA Stretch Code 2021 Compliance Services in Holden, Massachusetts

Complete MA Stretch Code 2021 compliance services for new construction in Holden, MA. We manage the entire process — plan review, energy modeling, blower door testing, duct leakage testing, and final HERS certification — so your project meets all requirements.

Holden has adopted the MA Stretch Code, requiring new residential buildings to achieve: HERS score 55 or below · blower door 3.0 ACH50 or less · total duct leakage 4% or less. All requirements must be verified by a RESNET-certified rater.

Our MA Stretch Code Compliance Process in Holden

  • Plan Review & Quote: Submit your building plans. We review them, model them to a HERS score, and provide a compliance roadmap and quote.
  • Pre-Construction Modeling: We model your plans to a HERS score before construction begins — identifying compliance risks cost-effectively.
  • Construction Phase Testing: Intermediate blower door and duct tests verify compliance during construction.
  • Final Certification: Final HERS Rating, RESNET-certified compliance report, and documentation for your building department.

Related Services in Holden

Frequently Asked Questions — MA Stretch Code Compliance in Holden

How much does MA Stretch Code compliance cost in Holden?

MA Stretch Code compliance package pricing in Holden: Single-family homes $1,850–$2,500 · Multifamily (per unit) $650–$1,200 · ADUs $1,600–$1,850. Full package includes HERS Rating, blower door testing, and duct leakage testing. Contact us for a free, project-specific quote.

Does Holden require the MA Stretch Code?

Yes. Holden has adopted the MA Stretch Code, requiring new residential construction to achieve: HERS score 55 or below · blower door 3.0 ACH50 or less · total duct leakage 4% or less — all verified by a RESNET-certified rater.

How do I prove MA Stretch Code compliance in Holden?

Compliance is documented through a RESNET-certified HERS Rating report. Our reports are accepted by the Holden building department and all Massachusetts municipalities as proof of MA Stretch Code compliance.

What is included in the full MA Stretch Code compliance package?

Our full compliance package for Holden includes: energy modeling from building plans · blower door air leakage test · duct leakage test · final HERS Rating · RESNET-certified compliance report for the building department.

Get MA Stretch Code Compliance in Holden

Contact HERS Rating Company for a free quote on MA Stretch Code 2021 compliance in Holden, MA. Full package: HERS Rating, blower door, and duct leakage testing.

Also Serving Nearby Cities

We provide MA Stretch Code Compliance services throughout the region. Nearby cities we serve: West Boylston · Paxton · Princeton · Rutland · Worcester

At HERS Rating Company, we are committed to providing the highest quality energy consulting services to homebuilders, architects, and developers across Massachusetts.

6175841809

24/7 Support

Newsletter

Sign up for our newsletter to receive exclusive updates, tips, and insights about energy-efficient building practices, financial incentives, and the latest energy code requirements in Massachusetts.

You have been successfully Subscribed! Ops! Something went wrong, please try again.

12 Pond St Ashland, MA 01721 United States

573 Washington St Quincy, MA 02169 United States

Scroll to Top